2017
DOI: 10.3329/jce.v29i1.33821
|View full text |Cite
|
Sign up to set email alerts
|

Risk Map for Facility Siting of an Ammonia-Urea Complex

Abstract: Abstract:In this study safer facility siting of an ammonia-urea complex is demonstrated by risk mapping. This risk map is useful for identifying safer zones within the plant at the design stage as well as before setting temporary shelters, i.e. shelters for contractors and maintenance workers etc. in an existing plant. To prepare the risk map a number of critical process units of an ammonia-urea complex are selected as the sources of toxic release and blast overpressure. Locations of control room and three ope… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 12 publications
(19 reference statements)
0
1
0
Order By: Relevance
“…Looking at various structures involved, plant layout design is a multidisciplinary task that needs partnership among different experts (Lira-Flores et al, 2019;Rahman et al, 2014). And according to Syeda et al (2017), every failure has certain repercussions and effects on the surrounding region. Understanding the potential effects of these failures on the nearby facilities and their occupants is essential to designing a layout with the least amount of risk.…”
Section: Plant Layoutmentioning
confidence: 99%
“…Looking at various structures involved, plant layout design is a multidisciplinary task that needs partnership among different experts (Lira-Flores et al, 2019;Rahman et al, 2014). And according to Syeda et al (2017), every failure has certain repercussions and effects on the surrounding region. Understanding the potential effects of these failures on the nearby facilities and their occupants is essential to designing a layout with the least amount of risk.…”
Section: Plant Layoutmentioning
confidence: 99%