Risk Management Approach: Drilling and Completion Projects

Abstract: This manuscript describes the approach in the risk management developed and implemented while operating 21 drilling rigs on 13 fields simultaneously in the Middle East, which resulted in 40% reduction of non-productive time. Well construction process requires a lot of attention on different levels and from different sides to ensure trouble-free execution. The bigger the volume of work, the higher the chance of a costly mistake. The risk management process was split in several steps, where differ… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…These seek to recover control while having the fewest negative effects on the well's short-and long-term integrity and productivity. And more stringent tertiary well control techniques may be used if these primary and secondary measures are unsuccessful (Ruzhnikov & Yurtaev, 2021). The Driller Method, Wait & Weight Method, Concurrent Method, and Volumetric Method are some of the well control systems that are investigated for this purpose in order to choose the best and most effective well control system.…”
Section: Introductionmentioning
confidence: 99%
“…These seek to recover control while having the fewest negative effects on the well's short-and long-term integrity and productivity. And more stringent tertiary well control techniques may be used if these primary and secondary measures are unsuccessful (Ruzhnikov & Yurtaev, 2021). The Driller Method, Wait & Weight Method, Concurrent Method, and Volumetric Method are some of the well control systems that are investigated for this purpose in order to choose the best and most effective well control system.…”
Section: Introductionmentioning
confidence: 99%