Risk level assessment while organizational-managerial decision making in the condition of dynamic external environment

Abstract: RiSK level ASSeSSmeNT while oRgANiZATioNAl-mANAgeRiAl DeCiSioN mAKiNg iN The CoNDiTioN of DyNAmiC exTeRNAl eNviRoNmeNT Purpose. Forming a complex factor of the project risk level assessment while organizational and economic decision making in a dynamic external environment based on measurement theory. methodology. The results are obtained through the application of the following methods: scientific generalization-for the formulation of scientific problems and general conclusions; measurement-to assess the proj… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…It is proposed to determine the environmental friendliness of a high-rise building as follows: The value of the component of the factor of the environmental friendliness of the high-rise building interior is calculated from the formula that is similar to formula (10).…”
Section: Results Of the Formalization Of Influence Factors In The Ratmentioning
confidence: 99%
See 1 more Smart Citation
“…It is proposed to determine the environmental friendliness of a high-rise building as follows: The value of the component of the factor of the environmental friendliness of the high-rise building interior is calculated from the formula that is similar to formula (10).…”
Section: Results Of the Formalization Of Influence Factors In The Ratmentioning
confidence: 99%
“…Article [10] deals with the substantiation of organizational and managerial decisions under conditions of the changeable external environment, taking into consideration the risk of a project. The difference of the proposed approach is refusal from a priori assumptions about the stochasticity of the studied processes and magnitudes, as well as in the application of the measurement theory.…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
“…Step 4. We solve the problem for combined measures (1, 2) and (3,4). The solution is given in Table 15.…”
Section: Fig 1 Structure Of a Dichotomous Task Representationmentioning
confidence: 99%
“…The results of the problem for combined measures (1,2,3,4) and (5 Conclusions. Industrial risk management is associated with material costs of the enterprise for occupational safety measures.…”
Section: Table 17mentioning
confidence: 99%
See 1 more Smart Citation