Safety and Reliability of Complex Engineered Systems 2015
DOI: 10.1201/b19094-101
|View full text |Cite
|
Sign up to set email alerts
|

Risk control in the well drilling phase: BOP system reliability assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
8
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(8 citation statements)
references
References 15 publications
0
8
0
Order By: Relevance
“…however, that is a contingency as it requires time to deploy the ROV. The standard procedure entitles the driller to use the BOP control panel and/or the emergency shut-down system (ESD) (Strand & Lundteigen, 2015).…”
Section: Blowout Preventer Systemsmentioning
confidence: 99%
See 4 more Smart Citations
“…however, that is a contingency as it requires time to deploy the ROV. The standard procedure entitles the driller to use the BOP control panel and/or the emergency shut-down system (ESD) (Strand & Lundteigen, 2015).…”
Section: Blowout Preventer Systemsmentioning
confidence: 99%
“…A Technical review detailed by Strand & Lundteigen (2015), identified seven distinct BOP well isolation (close-in) scenarios that vary in accordance with the drilling stage, drilling technique and the arrangement of: drill string position and spacing, pressure, well geometry, and kick tolerance/fracture gradient. Kick tolerance is the maximum amount of influx of certain density that would cause the weakest formation interval to fracture.…”
Section: Blowout Preventer Systemsmentioning
confidence: 99%
See 3 more Smart Citations