All Days 2001
DOI: 10.2118/68447-ms
|View full text |Cite
|
Sign up to set email alerts
|

Risk-Based Well Control Planning: The Integration of Random and Known Quantities in a Computerized Risk Management Tool

Abstract: Site-specific challenges related to water depth, geological and environmental conditions, rapid technological development and increased demands with respect to cost effectiveness and environmental consciousness are all factors that impact the uncertainty picture related to drilling and well operations. Thus risks related to undesirable outcomes such as kick and blowout are also influenced. It is however questionable whether the ruling practices for use of quantitative risk analyses in planning of the operation… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2002
2002
2019
2019

Publication Types

Select...
2
2
2

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(6 citation statements)
references
References 5 publications
0
6
0
Order By: Relevance
“…[1][2][3] The QRA approach considers the uncertainty of each input variable and provides comprehensive statistical properties of pore pressure, fracture gradient, and EMW, such as means, deviations, and probabilities. The information will be critical for high-pressure, high-temperature (HPHT) wells when pore pressure and fracture gradient margin is low.…”
Section: Qra Methodologymentioning
confidence: 99%
See 2 more Smart Citations
“…[1][2][3] The QRA approach considers the uncertainty of each input variable and provides comprehensive statistical properties of pore pressure, fracture gradient, and EMW, such as means, deviations, and probabilities. The information will be critical for high-pressure, high-temperature (HPHT) wells when pore pressure and fracture gradient margin is low.…”
Section: Qra Methodologymentioning
confidence: 99%
“…Study shows that the bottomhole EMW is a Gaussian distribution. 2 As shown in Fig. 2, there will be uncertainties of EMW to balance pore pressure and not to exceed fracture gradient.…”
Section: Applicationsmentioning
confidence: 99%
See 1 more Smart Citation
“…The KickRisk model [4] is a tool which has been developed to analyse these uncertainties in a systematic approach. This involves a comprehensive collection of data input which is assumed to affect the probability for inducing kicks.…”
Section: Risk Based Approaches For Planning Of Drilling Operationsmentioning
confidence: 99%
“…Several research and development projects are being conducted in the Norwegian offshore petroleum industry addressing performance of defences/barriers. Most of these are internal projects, but some results are publicly available [1][2][3]. Most of these studies have a limited scope with respect to the barriers covered, and few of them try to quantify the performance of safety barriers.…”
Section: Introductionmentioning
confidence: 99%