Risk‐based stochastic day‐ahead operation for data centre virtual power plants

Abstract: Data centres (DCs) have rapidly expanded in recent years due to increasing demand for cloud services. The costs incurred by electricity and water consumption contribute to a major portion of DC operating costs. This article addresses the day-ahead operation of a DC in the context of a virtual power plant (VPP) under the grid-connected mode. The day-ahead operation problem is formulated as a two-stage stochastic mixed integer linear programming (MILP) model that considers workload schedules among server cluster… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 11 publications
(7 citation statements)
references
References 45 publications
(92 reference statements)
0
7
0
Order By: Relevance
“…Without the loss of generality, batch workloads in this study are described by the following characteristics: required CPU frequency, execution time periods, continuous execution requirements (i.e. continuous or interruptible workload), and completion deadline [24,25].…”
Section: Data Centre Workloadsmentioning
confidence: 99%
See 1 more Smart Citation
“…Without the loss of generality, batch workloads in this study are described by the following characteristics: required CPU frequency, execution time periods, continuous execution requirements (i.e. continuous or interruptible workload), and completion deadline [24,25].…”
Section: Data Centre Workloadsmentioning
confidence: 99%
“…Related constraints, such as DG units, BESS, and minimum on/off time constraint of server clusters can be found in our previous work [25]. In addition, CHP units are modelled using a standardised formulation [29].…”
Section: Stochastic Milp Modelmentioning
confidence: 99%
“…To address specific challenges such as the intermittent nature of distributed renewable sources and their participation in the electricity market, the concept of a virtual power plant (VPP) has been developed [7]. Distributed energy resources (DERs) are indirectly enabled to contribute in the wholesale electricity markets via VPPs, since they can participate in these markets just as a conventional generation plant can [8][9][10]. Different applications of VPPs in a power system have been investigated in various studies [11][12][13][14].…”
Section: Nomenclaturementioning
confidence: 99%
“…Economic dispatch (ED) plays a fundamental role in the powers system and has been implemented in VPP operations [2,3,[6][7][8][9]. Table 1 concludes the characteristics of state of the art and makes a comparison with the proposed strategy.…”
Section: Introductionmentioning
confidence: 99%
“…Most previous commonly employed simple power flow equations in ED should be improved to accommodate aforementioned issues in ADN. Simplified power balance or DC power flow model is considered in [2,3,[6][7][8] neglecting power loss for DN and the P-Q coupling impact on voltage operation feasibility. A relaxed power balance considering high R/X ratio is presented in [9] but only DGs are considered excluding other DER.…”
Section: Introductionmentioning
confidence: 99%