Risk assessment of route options for the Hanau–Würzburg/Fulda railway project

Abstract: In the course of the preliminary planning of the new Gelnhausen–Fulda railway line which is part of the railway project Hanau–Würzburg/Fulda, two route options with tunnels, bridges, cuts and embankments are to be investigated and assessed as efficiently as possible with regard to potential geotechnical risk areas. Due to the geological and hydrogeological conditions within the north‐eastern Hessian Buntsandsteingebirge, several groundwater levels, landslides in tunnel portal areas and karstification structure… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Assessing the risks of construction projects has become an essential part of engineering construction in recent years [6]. To minimize the risks of construction projects in a hazardous environment, various models, methods, and simulation approaches are employed by scholars for risk evaluation and control in such areas as project investment and financing [7,8], construction [9,10], and operation management [11], thus facilitating the improvement of project risk management. Meanwhile, risk evaluation at different working stages of water conservancy projects is studied by many scholars.…”
Section: Introductionmentioning
confidence: 99%
“…Assessing the risks of construction projects has become an essential part of engineering construction in recent years [6]. To minimize the risks of construction projects in a hazardous environment, various models, methods, and simulation approaches are employed by scholars for risk evaluation and control in such areas as project investment and financing [7,8], construction [9,10], and operation management [11], thus facilitating the improvement of project risk management. Meanwhile, risk evaluation at different working stages of water conservancy projects is studied by many scholars.…”
Section: Introductionmentioning
confidence: 99%