Risk Assessment of Resources Factor in Affecting Project Time

Abstract: Some risk factors contribute to various adverse effects on project implementation, especially the construction project. Risk needs to be recognized by analyzing the relationship between frequency of risks occurrence and impacts that may arise regarding construction time completion. The superposition of frequency and impact will indicate the risk importance of various risk factors. This research, therefore, aimed to assess the risk importance in time aspects of construction implementation to the contractor as t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
3
1
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 23 publications
1
4
0
Order By: Relevance
“…e variables are lack of labour, unskilled labour, undisciplined labour, and low productivity of labour. e dominant factor is in line with Husin's previous research, which only examines the project objective of time [9]. We stated that integrating all three criteria of cost, time, and quality simultaneously is more logic to analyze risk variable ranking.…”
Section: Introductionsupporting
confidence: 77%
See 2 more Smart Citations
“…e variables are lack of labour, unskilled labour, undisciplined labour, and low productivity of labour. e dominant factor is in line with Husin's previous research, which only examines the project objective of time [9]. We stated that integrating all three criteria of cost, time, and quality simultaneously is more logic to analyze risk variable ranking.…”
Section: Introductionsupporting
confidence: 77%
“…. e normalisation method is used 4 Advances in Civil Engineering to construct the weighted normalised fuzzy decision matrix as formula (9). is normalisation method is conducted by preserving the property of triangular of fuzzy numbers of (0, 1):…”
Section: Normalised Fuzzy Multiple Criteria Decision-making (Normalismentioning
confidence: 99%
See 1 more Smart Citation
“…The speci c factors and their classi cation are shown in Table 3. The connection of construction process steps(S16) 13,15,33,35,37,44 Construction safety organization(S17) 32,34,45 12. Political environment: It refers to the external political situation of the engineering construction project, the national policy, and its changes.…”
Section: Determination Of In Uencing Factors Based On Questionnaire Methodsmentioning
confidence: 99%
“…Hossen et.al., (2015) used AHP to analyse severity of risk and frequency of occurrence of risk by RII method in their study of construction delay risk in international nuclear power plant. Husin et al, (2018) used Frequency Index (FI) and Severity Index (SI) similar to RII and AHP in their study of risk assessment of resource factor in affecting project time. Muneeswaran et al, (2020) in their study of schedule delay and risks in Indian construction industry also used RII method.…”
Section: Relative Importance Of Indexmentioning
confidence: 99%