Abstract:A rigid riser system has been designed, built, and proven as an effective method to conduct coiled tubing operations on floating platforms. This system is installed above the Christmas tree which is supported by the platform's production riser and riser tensioner system. The rigid riser set up is a passive system that does not require the use of a crane or other mechanisms to support or hold up the coiled tubing injector head during operations. The axial load resulting from the weight of the injector head, coi… Show more
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.