All Days 2003
DOI: 10.4043/15129-ms
|View full text |Cite
|
Sign up to set email alerts
|

Revitalizing a Mature Sand-Prone Field by Installing Enhanced Gravel-Pack Completions - a Case Study

Abstract: The Dulang oilfield is located some 130 km offshore Terengganu in Peninsular Malaysia and is structurally complex. Production from the field began in March 1991, and oil recovery averaged 26,000 STB/D with peak production reaching approximately 50,000 STB/D. As with the other field developments in the Malay Basin, sand production was not anticipated under normal drawdown or producing conditions, and thus, all the wells in Dulang field were completed without any sand-control measures.In the later stages of the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2005
2005
2005
2005

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 3 publications
(3 reference statements)
0
1
0
Order By: Relevance
“…1 While these completions have been capable of delivering the operators' goals, the completions discussed in this paper can offer alternative options and other significant benefits for the completion 2 . In the most extensive deepwater reservoirs, such as those in Brazil, stacked multi-zone sand-control completions have been applied in both injection and production wells.…”
Section: Introductionmentioning
confidence: 99%
“…1 While these completions have been capable of delivering the operators' goals, the completions discussed in this paper can offer alternative options and other significant benefits for the completion 2 . In the most extensive deepwater reservoirs, such as those in Brazil, stacked multi-zone sand-control completions have been applied in both injection and production wells.…”
Section: Introductionmentioning
confidence: 99%