2019
DOI: 10.1016/j.tej.2019.106671
|View full text |Cite
|
Sign up to set email alerts
|

Revisiting the challenges of Indian Power Transmission System: An integrated approach of total interpretive structural modeling and analytic hierarchy process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(9 citation statements)
references
References 14 publications
0
7
0
Order By: Relevance
“…This study has used the principles of TP of TOC to minimize the most important causal barrier, i.e. "absence of strategic planning of Indian power transmission system identified in the study" (Upreti et al, 2018 andUpreti et al, 2019). The key objective of the study is to enable planning of the transmission sector in a holistic manner using realistic and proactive approaches.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…This study has used the principles of TP of TOC to minimize the most important causal barrier, i.e. "absence of strategic planning of Indian power transmission system identified in the study" (Upreti et al, 2018 andUpreti et al, 2019). The key objective of the study is to enable planning of the transmission sector in a holistic manner using realistic and proactive approaches.…”
Section: Discussionmentioning
confidence: 99%
“…An overview of these challenges has been shown in Table I. In an another study conducted by Upreti et al (2019), have also emphasized that IPTS is going through a gloomy phase, where in transmission networks are choked and congested. In support of the study conducted by Upreti et al (2018), Upreti et al (2019) have identified critical challenges out of all the nine challenges identified by Upreti et al (2018) using two powerful methodologies, total interpretive structural modeling and analytic hierarchy process, it is necessary to eliminate these barriers immediately from the IPTS to evacuate power efficiently through the transmission network.…”
Section: Power Transmission Systemmentioning
confidence: 99%
See 1 more Smart Citation
“…Throughout this procedure, the items in each set in the hierarchy are compared to their corresponding group members ( Munizu and Riyadi 2021 ). Professionals in the field are frequently asked to assess the relative importance of issues using the widely used Saaty's nine-point scale (see Table 3 ) ( Upreti et al., 2019 ). The scale goes from one to nine, with one indicating “equal importance of both indicators” and nine indicating “one indicator is much more important than the other.” As a consequence, the experts provide a numerical value to the judgment based on their pick.…”
Section: Methodsmentioning
confidence: 99%
“…As a final result the authors obtained that one of the algorithms was unambiguously ranked the highest for the user preferences selected. In [27] N. Upereti et al used AHP to identify critical challenges in the field of India's power transmission system on the basis of nine barriers indicated as holding back the development of the power sector of India. The analysis performed, which based on the experience of set of industry experts, power advisors, equipment manufacturers and policy makers, indicated that a necessity of intervention on the level of energy policy was the most critical challenge, which, after applying into the system, may cause neutralization other challenges considered.…”
Section: Introductionmentioning
confidence: 99%