2023
DOI: 10.1016/j.tust.2023.105110
|View full text |Cite
|
Sign up to set email alerts
|

Review of health inspection and reinforcement design for typical tunnel quality defects of voids and insufficient lining thickness

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(2 citation statements)
references
References 68 publications
0
1
0
Order By: Relevance
“…For the various quality problems exposed by the secondary lining of mountain tunnels, many scholars have summarized a large number of experiences from the concrete lining [5] such as the compression damage of concrete lining [6], concrete lining maintenance temperature [7], concrete lining stress [8], concrete lining thickness insufficiency [9], the preparation of high-performance concrete [10], and the concrete lining pressure grouting technology [11] so as to reach a conclusion regarding the prevention and management system for dehiscence, cracks, and other diseases. Although the current management of engineering quality problems has achieved remarkable results [12], to solve the quality problems of mountain tunnel casting from the root, it is necessary to start from the flow characteristics of concrete itself in order to reveal the flow characteristics of freshly mixed concrete during the lining casting process and then grasp the root of the problems.…”
Section: Introductionmentioning
confidence: 99%
“…For the various quality problems exposed by the secondary lining of mountain tunnels, many scholars have summarized a large number of experiences from the concrete lining [5] such as the compression damage of concrete lining [6], concrete lining maintenance temperature [7], concrete lining stress [8], concrete lining thickness insufficiency [9], the preparation of high-performance concrete [10], and the concrete lining pressure grouting technology [11] so as to reach a conclusion regarding the prevention and management system for dehiscence, cracks, and other diseases. Although the current management of engineering quality problems has achieved remarkable results [12], to solve the quality problems of mountain tunnel casting from the root, it is necessary to start from the flow characteristics of concrete itself in order to reveal the flow characteristics of freshly mixed concrete during the lining casting process and then grasp the root of the problems.…”
Section: Introductionmentioning
confidence: 99%
“…Due to various factors including tunnel construction and management practices, geological conditions, service environment, and duration, a significant number of operational tunnels exhibit quality defects and issues, such as voids behind the lining, insufficient lining thickness, water seepage, and lining cracking. Among these issues, structural cracking is particularly prominent, leading to severe performance degradation of tunnels and the posing of a threat to their operational safety [1][2][3]. Currently, the lining reinforcement and strengthening methods include paste fibre, sleeve arch reinforcement, shotcrete reinforcement, and steel plate reinforcement.…”
Section: Introductionmentioning
confidence: 99%