Revenue Management in Make-To-Order Manufacturing: Case Study of Capacity Control at ThyssenKrupp VDM

Abstract: Standard-Nutzungsbedingungen:Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Zwecken und zum Privatgebrauch gespeichert und kopiert werden.Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich machen, vertreiben oder anderweitig nutzen.Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, gelten abweichend von diesen Nutzungsbedingungen die in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
15
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 31 publications
(15 citation statements)
references
References 24 publications
0
15
0
Order By: Relevance
“…However, the scheduling decisions must be made immediately upon arrival of the order, whereas the online scheduling approach in the present paper can change the release date of an order until its production is actually started. Hintsches et al (2010) consider long planning periods so that a planning period is long enough that an order finishes production within the same planning period in which it was started. Again, there is only one possible production start date per order.…”
Section: Literature Reviewmentioning
confidence: 99%
See 4 more Smart Citations
“…However, the scheduling decisions must be made immediately upon arrival of the order, whereas the online scheduling approach in the present paper can change the release date of an order until its production is actually started. Hintsches et al (2010) consider long planning periods so that a planning period is long enough that an order finishes production within the same planning period in which it was started. Again, there is only one possible production start date per order.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The main difference from models in the literature on MTO-RM (Spengler et al, 2007;Hintsches et al, 2010) and FP-RM Petrick et al, 2010Petrick et al, , 2012 is that in the SDP (4), there are two different time levels at which decisions are made. Order acceptance decisions are made immediately after order arrival, while order release decisions are only made at the beginning of each planning period.…”
Section: Profitsmentioning
confidence: 99%
See 3 more Smart Citations