2008 IEEE International Symposium on Industrial Electronics 2008
DOI: 10.1109/isie.2008.4677244
|View full text |Cite
|
Sign up to set email alerts
|

Reuse of models in the lifecycle of production plants using HiL simulation models for diagnosis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2008
2008
2023
2023

Publication Types

Select...
3
3
1

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(6 citation statements)
references
References 12 publications
0
6
0
Order By: Relevance
“…It can be used for determining the nominal state of the plant. If the simulation is operated in parallel to the plant, the measurable states of the real plant and of the simulation can be compared and deviations can be detected (Kain et al, 2008;Kain et al 2010;). Thus, the signals in the simulation can be used for realizing diagnostics.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…It can be used for determining the nominal state of the plant. If the simulation is operated in parallel to the plant, the measurable states of the real plant and of the simulation can be compared and deviations can be detected (Kain et al, 2008;Kain et al 2010;). Thus, the signals in the simulation can be used for realizing diagnostics.…”
Section: Methodsmentioning
confidence: 99%
“…Additionally, if the control system was optimized in the engineering phase according to assumed process parameters divergent from the current situation, changes of the parameters in the control system can improve the plant behavior. Therefore, the models of HiL Simulation can be applied predicting the behavior of the controlled plant, called Forward Simulation (Kain et al, 2008;Kain et al 2010;). Optimizing the control system offline based on verified HiL Simulation models representing the behavior of the plant in detail offers several advantages: In a first step, the optimal parameters can be determined based on simulation experiments with diverse constraints without influencing the real plant.…”
Section: Forward Simulationmentioning
confidence: 99%
“…It is already scheduled, but not yet implemented. The need to use simulation or engineering data parallel to the production process has also been recognized by [20].…”
Section: Figure 14 Opc Ua Client and Address Spacementioning
confidence: 99%
“…The appearance of industrial applications based on tracking simulators has been hindered by the high development cost and time-consuming maintenance of first principle models (FPMs) [1]. In order to overcome this, simulation models developed during the process engineering could be used for implementing tracking simulators [4]. However, because these simulation models are created when the plant is not yet functioning, their results cannot be tuned using measurements from the targeted physical system and only data series of similar process plants are used as a reference.…”
Section: Introductionmentioning
confidence: 99%