Retrofitting traditional buildings: a risk-management framework integrating energy and moisture

Abstract: Traditional buildings constitute a large proportion of the building stock in many countries worldwide; around 40% of the UK's housing stock was built before 1940 and was primarily made with solid masonry walls. Only 11% of UK solid-walled dwellings had insulation installed, suggesting the high potential of the low-carbon retrofit of traditional buildings. However, there is evidence of the occurrence of unintended consequences, often associated with excess moisture. A method is presented for moisture risk manag… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 11 publications
0
6
0
Order By: Relevance
“…The sustainable management of a historic building should consider avoiding adverse impacts (Araoz, 2013). Therefore, even if trade-offs are justifiable for the public benefit, a risk-mitigation plan must be put in place (Bond & Worthing, 2016Gori et al, 2021).…”
Section: Role Of Conservation Plansmentioning
confidence: 99%
See 4 more Smart Citations
“…The sustainable management of a historic building should consider avoiding adverse impacts (Araoz, 2013). Therefore, even if trade-offs are justifiable for the public benefit, a risk-mitigation plan must be put in place (Bond & Worthing, 2016Gori et al, 2021).…”
Section: Role Of Conservation Plansmentioning
confidence: 99%
“…Finally, the last white box 'Decision' refers to the decision-making process The risk assessment was described as an aid tool for decision-making as it excluded highly risky options (ASHRAE, 2019). However, risks are also likely to occur after the implementation of measures in the post-retrofit phase (Gori et al, 2021). Hence the EN 16883:2017 indication that ideally, measures should be evaluated in a post-occupancy evaluation (POE) (CEN, 2017) and the PAS 2035 requirement for high-risk projects (e.g.…”
Section: Risk Management Processmentioning
confidence: 99%
See 3 more Smart Citations