Retirement-Driven Dynamic VAR Planning for Voltage Stability Enhancement of Power Systems With High-Level Wind Power

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
32
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 60 publications
(33 citation statements)
references
References 22 publications
0
32
0
Order By: Relevance
“…Many OSs use shunt capacitor switching to modify PS's reactive power flows and so the OSs optimize the PS. Such OSs are presented in [77][78][79][80][81][82]. OS in [83,84] optimize reactive power flows in a PS by changing the taps of on-load tap changers in transformers.…”
Section: Ps Oss Controlling a Special Ps Action Hardwarementioning
confidence: 99%
“…Many OSs use shunt capacitor switching to modify PS's reactive power flows and so the OSs optimize the PS. Such OSs are presented in [77][78][79][80][81][82]. OS in [83,84] optimize reactive power flows in a PS by changing the taps of on-load tap changers in transformers.…”
Section: Ps Oss Controlling a Special Ps Action Hardwarementioning
confidence: 99%
“…In this regard, these indicators may seem to be a proper tool for voltage stability assessment. Nevertheless, in the sequel, it will be shown that these indices have a major drawback, which is not considered in the literature . To explain this drawback, consider the simple network shown in Figure A, which includes three transmission lines connected in series.…”
Section: Improved Lsz Indicatorsmentioning
confidence: 99%
“…Nevertheless, in the sequel, it will be shown that these indices have a major drawback, which is not considered in the literature. 35,[48][49][50][51][52][53][54][55][56][57][58][59][60][61][62][63][64][65][68][69][70][71][72][73][74][75][76][77][78][79][80][81][82][83][84] To explain this drawback, consider the simple network shown in Figure 13A, which includes three transmission lines connected in series. In this network, the maximum transferable power is 67 as follows: When P max passes through the transmission corridor, it is expected that the line indices calculated for line 2 (or two other ones) reach to their critical threshold to show the proximity of the operating point to stability boundary.…”
Section: Figure 12mentioning
confidence: 99%
“…In earlier studies, many researchers focus on steady-state [3][4][5][6] or short-term voltage stability [7][8][9][10] separately and did not incorporate the two aspects together to maximise the beneficiary impact of STATCOMs on the power system. Lately, some researchers start to address this issue from both perspectives [11,12]. In [11], the authors propose a multiobjective optimisation model for STATCOM placement.…”
Section: Introductionmentioning