Day 1 Mon, October 31, 2022 2022
DOI: 10.2118/211249-ms
|View full text |Cite
|
Sign up to set email alerts
|

Restoration of High-Temperature Well Integrity via Real-Time Coiled Tubing Patch Application

Abstract: A prolific gas producer in Sarawak waters was shut-in and idle due to a tubing leak resulting in a significant decline in the total hub production. The well remained idle and required immediate remedial action to meet the contractual sales target. Hence, an expandable tubing patch was proposed to isolate the leak and reactivate the well faster. This paper presents data gathered to identify leak location, tubing patch design, and installation using real-time coil tubing. Several logging surveys w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 1 publication
0
0
0
Order By: Relevance