2020
DOI: 10.1140/epja/s10050-020-00068-1
|View full text |Cite
|
Sign up to set email alerts
|

Residual activation of the SPES Front-End system: a comparative study between the MCNPX and FLUKA codes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 29 publications
0
2
0
Order By: Relevance
“…The SPES project is a facility for the production of radioactive ion beams (RIBs) that will operate in the next few years at the INFN Legnaro National Laboratories. Recently, extensive calculations were performed in CloudVeneto with FLUKA Monte Carlo code, to evaluate the residual radioactivity generated on the materials of the SPES production apparatus in different times after the beginning of the facility operation, and specifically to estimate the external exposure of the personnel operating in the facility [10,11]. These studies must necessarily be addressed in the design phase of the plant and must include all the operation phases, up to the final disposal of the facility.…”
Section: Applied Research In Nuclear Physics Use Casesmentioning
confidence: 99%
“…The SPES project is a facility for the production of radioactive ion beams (RIBs) that will operate in the next few years at the INFN Legnaro National Laboratories. Recently, extensive calculations were performed in CloudVeneto with FLUKA Monte Carlo code, to evaluate the residual radioactivity generated on the materials of the SPES production apparatus in different times after the beginning of the facility operation, and specifically to estimate the external exposure of the personnel operating in the facility [10,11]. These studies must necessarily be addressed in the design phase of the plant and must include all the operation phases, up to the final disposal of the facility.…”
Section: Applied Research In Nuclear Physics Use Casesmentioning
confidence: 99%
“…The progressive target efficiency reduction demands the replacement of the TIS unit on a constant schedule. Due of the extremely radioactive environment [6], a network of remote handling devices is used to take care of this need in an automated manner. Following the irradiation on the SPES Front-End, exhausted TIS units must be stored in a secure area for radioactive decay before being disassembled.…”
Section: Introductionmentioning
confidence: 99%