Abstract:Abstract. The underground cavern group of Baihetan hydropower station is characteristic with complex geological condition, large buried depth and high stress, the local failures of surrounding rock mass which often occurred frequently during the construction process. To study the mechanisms of failures result from the unloading effect of excavation, in situ microseismic monitoring system was established on the No.1 construction branch tunnel of spillway tunnel located on the left bank of Baihetan Hydropower St… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.