2014
DOI: 10.4028/www.scientific.net/amr.1044-1045.397
|View full text |Cite
|
Sign up to set email alerts
|

Research on Technology Roadmaps of the Wind Power Industry Based on Bibliometrics and AHP Method - A Case Study of Wind Blade

Abstract: By taking wind turbine blade as an example, this article built the technology roadmaps model to research the critical techniques in wind power industry. In particular, the collection and visualized analysis were implemented with the use of bibliometrics and relative software; we realized the technology assessment of critical techniques by structuring AHP model; finally, the technology roadmaps were made based on evaluation result and the technology forecasting of wind blades was realized combining with the ind… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
(2 reference statements)
0
1
0
Order By: Relevance
“…He first used scenario planning to find out reasonable pictures of the common environment and then used scenarios for technology roadmapping, followed by the advantageous use of 'flex points'-essential developments that signal transitions along certain pathways. Regarding the AHP, Li et al [28] performed a technology assessment for critical techniques with a structuring AHP model. Lee et al [29] developed a two-stage multicriteria decision making (MCDM) method that helped to make a long-term systematic energy TRM and utilized the fuzzy AHP to allot the corresponding weights of the criteria effectively.…”
Section: Technology Roadmapmentioning
confidence: 99%
“…He first used scenario planning to find out reasonable pictures of the common environment and then used scenarios for technology roadmapping, followed by the advantageous use of 'flex points'-essential developments that signal transitions along certain pathways. Regarding the AHP, Li et al [28] performed a technology assessment for critical techniques with a structuring AHP model. Lee et al [29] developed a two-stage multicriteria decision making (MCDM) method that helped to make a long-term systematic energy TRM and utilized the fuzzy AHP to allot the corresponding weights of the criteria effectively.…”
Section: Technology Roadmapmentioning
confidence: 99%