2010 International Conference on Power System Technology 2010
DOI: 10.1109/powercon.2010.5666153
|View full text |Cite
|
Sign up to set email alerts
|

Research on power frequency overvoltage of UHV double-circuit transmission system with series compensation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2020
2020

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The amplitude and duration of the power frequency temporary overvoltage play a very important role in the selection of the rated voltage of arrester and the insulation capacity and air clearances of equipment [10–12]. The national standard specifies that the power frequency overvoltage of UHV projects should not exceed 1.3 p.u.…”
Section: Research On Overvoltage On Ac 1000 Kv Side Of Converter Trmentioning
confidence: 99%
“…The amplitude and duration of the power frequency temporary overvoltage play a very important role in the selection of the rated voltage of arrester and the insulation capacity and air clearances of equipment [10–12]. The national standard specifies that the power frequency overvoltage of UHV projects should not exceed 1.3 p.u.…”
Section: Research On Overvoltage On Ac 1000 Kv Side Of Converter Trmentioning
confidence: 99%