2011
DOI: 10.4028/www.scientific.net/amr.225-226.623
|View full text |Cite
|
Sign up to set email alerts
|

Research on Movement and Deformation of Rock Strata between Coal Seams in Pillar Upward Mining of Left-Over Coal with Numerical Simulation Method

Abstract: Based on the occurrence condition of coal seams and the geological condition on coal seam mining in Coal Mine Group Baijiazhuang, after pillar mining the 8th coal seam was well controlled, ascending mining the 6th coal seam, mining process was numerically simulated by FLAC3D,the variation law of displacements field on interlayer strata between the 6th coal seam and the 8th coal seam at different face advance were analyzed. Vertical displacement on rock strata increased gradually from below. A control stratum e… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles