2021
DOI: 10.1051/e3sconf/202123303003
|View full text |Cite
|
Sign up to set email alerts
|

Research on Cracking Control of Immersed Tube Tunnels Concrete by Pre-heating treatment

Abstract: Herein, the pre-heating treatments are researched. With diversity of zone and temperature, highest average temperature of the section 10cm below surface was 14.7°C, which is lower than that of the concrete block. And the distance of 20cm and 40cm to surface of section, the temperature is 11.8°C and 9.8°C, respectively. When the heating water of 60°C, the increase of 48h to 72h, the highest temperature is about 47.2°C and 49.6°C.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?