Research of Production Scheduling Based on Theory of Constraints

Abstract: Abstract-An improved DBR scheduling method is proposed based on discrete system simulation method. The simulation model is established to identify bottleneck resources and determine the buffer. The improved simulated annealing is used to optimize and determine the DBR control parameters. The example results confirm the accuracy and validity of presented method.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2017
2017
2019
2019

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…Like a chain, the system performance is limited by the weakest linkconstraint. This means that no matter how much effort you put into improving the processes of a system, only the improvements to the weakest link will produce any detectable system improvement, [12] to [15]. TOC provides tools and applications that enable organizations to identify the constraints (or few of them), exploits them and subordinates others based on that decision in order to get the most out of the existing system or organization.…”
Section: Fig 2 Basic Principles Of Pull-based Approachmentioning
confidence: 99%
See 1 more Smart Citation
“…Like a chain, the system performance is limited by the weakest linkconstraint. This means that no matter how much effort you put into improving the processes of a system, only the improvements to the weakest link will produce any detectable system improvement, [12] to [15]. TOC provides tools and applications that enable organizations to identify the constraints (or few of them), exploits them and subordinates others based on that decision in order to get the most out of the existing system or organization.…”
Section: Fig 2 Basic Principles Of Pull-based Approachmentioning
confidence: 99%
“…Additionally, the Drum-Buffer-Rope (DBR) [15], [19], [20] is powerful and robust TOC solution that is intended to manage the flow of work through a (development) process rather than managing the capacity of resources. It is designed to protect against general cause variation that cannot be removed from the system and some special cause variation.…”
Section: Fig 2 Basic Principles Of Pull-based Approachmentioning
confidence: 99%
“…Like a chain, the system performance is limited by the weakest link -constraint. This means that no matter how much effort you put into improving the processes of a system, only the improvements to the weakest link will produce any detectable system improvement [13][14][15][16]. TOC provides tools and applications that enable organizations to identify the constraints (or few of them), exploits them and subordinates others based on that decision in order to get the most out of the existing system or organization.…”
Section: Introductionmentioning
confidence: 99%
“…Additionally, the Drum-Buffer-Rope (DBR) [16,20,21] is powerful and robust TOC solution that is intended to manage the flow of work through a (development) process rather than managing the capacity of resources. It is designed to protect against general cause variation that cannot be removed from the system and some special cause variation (e.g., Murphy).…”
Section: Introductionmentioning
confidence: 99%