2019
DOI: 10.1088/1757-899x/687/4/044042
|View full text |Cite
|
Sign up to set email alerts
|

Research methods for seismoacoustic monitoring of large underground facilities

Abstract: Large underground mine workings of hydropower facilities created in complex engineering-geological and seismic conditions significantly differ from industrial underground facilities designed for different purpose in their construction, operation and operating conditions. This makes it extremely urgent to organize seismic-acoustic monitoring in order to ensure their safe and reliable operation and prediction of the status of the underground circuit. The solution of this problem requires the improvement of metho… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 2 publications
0
0
0
Order By: Relevance
“…-georadar search for buried structural elements of structures (Fig. 8) [20]; -investigation of the depth of immersion of piles of sheet pile walls and determination of their continuity by the seismoacoustic method (Fig. 9) [21];…”
Section: Methodsmentioning
confidence: 99%
“…-georadar search for buried structural elements of structures (Fig. 8) [20]; -investigation of the depth of immersion of piles of sheet pile walls and determination of their continuity by the seismoacoustic method (Fig. 9) [21];…”
Section: Methodsmentioning
confidence: 99%