2017
DOI: 10.1590/0103-6513.212116
|View full text |Cite
|
Sign up to set email alerts
|

Requirements processing for building design: a systematic review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(11 citation statements)
references
References 43 publications
0
6
0
Order By: Relevance
“…Understanding project context, identification of stakeholders, and systematic capture of client needs and expectations [35,38,[46][47][48][49] [ 37,41,44,50] Analyse Interpretation of user needs, which are translated into explicit requirements [35,38,46,48,49] [ 37,41,44,50] Structure Definition of categories, organized in hierarchical levels, which group different types of requirements, such as space, components, and type of performance [48,49,51,52] [ 13,37,39,41] Translate Translation of requirements into solution-neutral specifications [35,46,47,49] [ 13,37,39,41] Store Storing all requirements in a repository [35,53] [ 7,13,27,54] Prioritise Identifying the most important requirements for different interest groups which need to be considered in product development [46] [ 26,37,41,…”
Section: Identifymentioning
confidence: 99%
“…Understanding project context, identification of stakeholders, and systematic capture of client needs and expectations [35,38,[46][47][48][49] [ 37,41,44,50] Analyse Interpretation of user needs, which are translated into explicit requirements [35,38,46,48,49] [ 37,41,44,50] Structure Definition of categories, organized in hierarchical levels, which group different types of requirements, such as space, components, and type of performance [48,49,51,52] [ 13,37,39,41] Translate Translation of requirements into solution-neutral specifications [35,46,47,49] [ 13,37,39,41] Store Storing all requirements in a repository [35,53] [ 7,13,27,54] Prioritise Identifying the most important requirements for different interest groups which need to be considered in product development [46] [ 26,37,41,…”
Section: Identifymentioning
confidence: 99%
“…Defining what 'value' means to a client within a particular context by bring the project stakeholders together and producing a clear statement of the project's objectives Samset and Volden [46] Project Governance The processes, systems, and regulations that the financing party must have in place to ensure that projects are successful ul Musawir, Serra [40] Benefit A flow of value that occurs when customers use project outputs Benefits Realisation Management A set of processes that ensure that projects, programs, and portfolios embed the requirements of business strategies into business-as-usual, in order to create value in a meaningful and sustainable manner Pegoraro and Paula [47] Requirement A statement that prescribes features that a product or service must have to satisfy demands or to achieve project stakeholders' goals Design Solution decision or action is chosen to meet the design requirements, which must be limited by the specifications…”
Section: Value Managementmentioning
confidence: 99%
“…Hu [102] Case Study Construction Wang, Zhang [91] Evaluative Study Construction Liao, Liao [128] Evaluative Study Construction Volk, Luu [103] Case Study Construction Eleftheriadis, Duffour [129] Evaluative Study Construction Thew and Sutcliffe [76] Evaluative Study IT Han, Li [130] Exploratory Case Study Engineering Design Müller, Ludwig [48] Evaluative Study IT ul Musawir, Serra [40] Qualitative Survey Study Construction Pegoraro and Paula [47] Systematic Literature Review Construction Rodrigues and Freire [87] Evaluative Study Construction Carrizo, Dieste [95] Evaluative Study IT Abeywickrama and Ovaska [131] Literature Review IT Goh and Loosemore [132] Qualitative Survey Study Construction Koh [133] Evaluative Study Construction Papadonikolaki, Verbraeck [134] mixed method approach plus caste study Construction Akcay, Dikmen [135] Construction Sinesilassie, Tabish [136] Qualitative Survey Study Construction Locatelli, Mariani [67] Evaluative Case Study Construction Lin, Zeng [137] Qualitative Survey Study Construction Cavka, Staub-French [63] Qualitative Survey Study Construction Sleiman, Hempel [138] Evaluative Study Construction Cardenas, Voordijk [139] Evaluative Study Construction Wiese, Ré [140] Evaluative Study IT Hastie, Sutrisna [141] Case Study, Survey Construction Sanderson and Winch [142] Evaluative Study Construction Mok, Shen [56] Case Study Construction Samset [143] Literature Review Construction Eckart, McPhee [144] Literature Review Construction Saoud, Omran [145] Case Study, Survey Construction Clarke, Gleeson [146] Evaluative Study Construction Oraee, Hosseini [147] Systematic Literature Review Construction Vernet and Coste…”
Section: Geopolitics Economics Environmentmentioning
confidence: 99%
“…Other concerns are discussed in the literature including the impact of project brief clarity on project performance (Vahabi et al, 2020). Additionally, Pegoraro and Paula (2017) identified the critical factors affecting the requirements' identification process, including: the lack of open and effective communication, lack of clarity of the objectives, lack of precision in defining client's requirements, client's inexperience, difficulties in accommodating requirements of all involved stakeholders, among other problems. The study also provided some guidelines for overcoming such problems within design, focusing on information clearness to define objectives.…”
Section: Introductionmentioning
confidence: 99%