1979
DOI: 10.2172/6010497
|View full text |Cite
|
Sign up to set email alerts
|

Requirements assessment of wind power plants in electric utility systems. Final report

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

1979
1979
2010
2010

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…) CAPACITY CREDIT/CAPACITY DISPLACEMENT -"The amount of conventional generating capacity which may be omitted from a utility's planned requirements if a solar plant is planned. A function of effective capacity" (Marsh 1979) • CAPACITY' FACTOR/PLANT FACTOR -"The ratio of energy produced divided by the product of rated capacity and the number of hours in the operating period" (VanKuiken et al 1978) • CAPACITY REMIX SAVINGS -See Capital Savings • CAPITAL SAVINGS -The savings in conventional capital costs that accrue to the user as a result of operating a solar plant over its lifetime.…”
Section: Developing or Acquiring Methods For Economic Assessmentmentioning
confidence: 99%
“…) CAPACITY CREDIT/CAPACITY DISPLACEMENT -"The amount of conventional generating capacity which may be omitted from a utility's planned requirements if a solar plant is planned. A function of effective capacity" (Marsh 1979) • CAPACITY' FACTOR/PLANT FACTOR -"The ratio of energy produced divided by the product of rated capacity and the number of hours in the operating period" (VanKuiken et al 1978) • CAPACITY REMIX SAVINGS -See Capital Savings • CAPITAL SAVINGS -The savings in conventional capital costs that accrue to the user as a result of operating a solar plant over its lifetime.…”
Section: Developing or Acquiring Methods For Economic Assessmentmentioning
confidence: 99%
“…valu~s for different schedules of sources [2,4,6). For the dotermiM t lo,n of LOLP the example above shows that hourly expected value of energy is inadequate.…”
Section: The Correlation Between Load and Intermittent Energymentioning
confidence: 99%
“…One could ~hen weight the loss of load probability according to the probability of the level. The problem here is that one is in danger of choosing all the worst "cases" across all hours, and then moving through the scenarios until all the best "cases" are treated [6). The process would not be exhaustive and quite inefficient with regard to computer usage.…”
Section: The Correlation Between Load and Intermittent Energymentioning
confidence: 99%
See 1 more Smart Citation
“…The method of arriving at this capacity credit is usually achieved through equating LOLP values for different schedules of sources [2,4,6]. For the determinatio.n of LOLP the example above shows that -.…”
Section: The Correlation Between Load and Intermittent Energymentioning
confidence: 99%