2013
DOI: 10.1016/j.fusengdes.2013.04.043
|View full text |Cite
|
Sign up to set email alerts
|

Repair of manufacturing defects in the armor of plasma facing units of the ITER Divertor Dome

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…2) of the ITER reactor under construction was successfully carried out using these filler metals at the FSUE "D.V. Efremov Scientific Research Institute of Electrophysical Apparatus" (FSUE NIIEFA) [8,9]. The CuCrZr/W joint withstood cyclic tests of 1,000+1,000 cycles at a load from 3 to 5 MW/m 2 .…”
Section: Amorphous and Nanocrystalline Filler Metals Stemetmentioning
confidence: 99%
“…2) of the ITER reactor under construction was successfully carried out using these filler metals at the FSUE "D.V. Efremov Scientific Research Institute of Electrophysical Apparatus" (FSUE NIIEFA) [8,9]. The CuCrZr/W joint withstood cyclic tests of 1,000+1,000 cycles at a load from 3 to 5 MW/m 2 .…”
Section: Amorphous and Nanocrystalline Filler Metals Stemetmentioning
confidence: 99%