All Days 2006
DOI: 10.2118/102629-ms
|View full text |Cite
|
Sign up to set email alerts
|

Remediation of Production Loss Due to Proppant Flowback in Existing Wellbores

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractThis paper presents the results of experimental study and field case histories of a remedial treatment technique using a lowviscosity consolidating agent placed into the propped fractures by coiled tubing (CT) or jointed pipe coupled with a pressure pulsing tool. The treatment fluids are designed to provide consolidation for previously placed proppant near the wellbore without damaging the permeability of the proppant pack. The consolidation treatment transfo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
references
References 18 publications
0
0
0
Order By: Relevance