1988
DOI: 10.1109/24.9866
|View full text |Cite
|
Sign up to set email alerts
|

Reliability optimization of computer-communication networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

1992
1992
2020
2020

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 22 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…All-terminal connectivity: (see, e.g., Slyke and Frank, 1971;Wah Kiu and McAllister, 1988). It is also a special case of the Kterminal connectivity where K = V .…”
Section: Problem Contextmentioning
confidence: 99%
See 1 more Smart Citation
“…All-terminal connectivity: (see, e.g., Slyke and Frank, 1971;Wah Kiu and McAllister, 1988). It is also a special case of the Kterminal connectivity where K = V .…”
Section: Problem Contextmentioning
confidence: 99%
“…on expected value based performability metric, threshold value based performability metric, one or more connectivity metrics etc (see, e.g., Jan et al, 1993;Deeter and Smith, 1997;Reichelt and Rothlauf, 2004, etc. ) The other class of single objective reliable network design problem aims at optimizing the network performance measured in terms of a connectivity or performability metric while ensuring that the network establishment cost does not exceed a pre-specified budget (see, e.g., Jan et al, 1993;Wah Kiu and McAllister, 1988;Kroese et al, 2007 etc.). The multi-objective reliable network design problem aims at simultaneously optimizing the network establishment cost and network performance (see, e.g., Kim and Gen, 2000;Flores et al, 2003;Marseguerra et al, 2005;Taboada and Coit, 2007, etc.…”
Section: Problem Contextmentioning
confidence: 99%