2001
DOI: 10.1016/s0951-8339(00)00057-5
|View full text |Cite
|
Sign up to set email alerts
|

Reliability of jack-ups under extreme storm conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2003
2003
2021
2021

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 5 publications
0
6
0
Order By: Relevance
“…Table 3 shows the list of infrastructures and facilities that repairing shipyards require. The health and safety executive (HSE) standards are among these essential items because of the importance of safety in such an environment (Thomas et al , 2019; Vrålstad et al , 2018; Morandi et al , 2001). The long list was divided into three categories by interviewing with experts to determine the importance of these requirements.…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…Table 3 shows the list of infrastructures and facilities that repairing shipyards require. The health and safety executive (HSE) standards are among these essential items because of the importance of safety in such an environment (Thomas et al , 2019; Vrålstad et al , 2018; Morandi et al , 2001). The long list was divided into three categories by interviewing with experts to determine the importance of these requirements.…”
Section: Methodsmentioning
confidence: 99%
“…A wide range of studies have been performed in the field of drilling industry and shipyards, examined from different points of view such as maintenance and repair of jack-ups and the cost of maintenance, industry markets, shipyards, and jack-up legs’ analysis) Pisano et al , 2019; Guede, 2019; Nam et al , 2017; Li et al , 2018; Barlas and Izci, 2018; Shazzad Hosaain et al , 2018; Apergis et al , 2017; Kaiser, 2017; Ha et al , 2015; Zhao et al , 2014; Namkug and Ha, 2014; Xian-Gang and Yong, 2012; Pande et al , 2013; Perrons and Richards, 2013; Kaiser and Snyder, 2013; Cao et al , 2012; Zhang et al , 2012; Celebi and Vardar, 2008; Kaiser, 2008; Shabakhty et al , 2003; Morandi et al , 2001), which can help to understand and achieve the conclusive goal of the paper. The articles are divided into three sections, including first part: the jack-up market, second part: the jack-up R&M and third part: shipyards.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…In the meantime, many literatures have been dedicated to reduce the risk and improve the reliability of the jack-up rig operations (Shaples, et al, 1989; Morandi, et al, 2001; Le Tirant and Perol, 1993).…”
Section: Introductionmentioning
confidence: 99%
“…The scholars have paid attention to the jackup platform for a long time. Their research on the jackup include wide-ranging subjects such as the fluid-structure-soil interaction analysis (Bienen and Cassidy 2006;Gaudin et al 2011), the key substructures' strength analysis (Zhang et al 2012), fatigue and fracture analysis (Morandi et al 2001;Shabakhty 2011), the response analysis under extreme condition (Cassidy et al 2002;Tan et al 2003;Howarth et al 2004;Jensen and Capul 2006) and so on. However, the process of lifting up or down the huge, heavy legs that combine * Corresponding author.…”
Section: Introductionmentioning
confidence: 99%