2021
DOI: 10.3390/en14217428
|View full text |Cite
|
Sign up to set email alerts
|

Reliability Metrics for Generation Planning and the Role of Regulation in the Energy Transition: Case Studies of Brazil and Mexico

Abstract: In recent years electricity sectors worldwide have undergone major transformations, referred to as the “energy transition”. This has required energy planning to quickly adapt to provide useful inputs to the regulation activity so that a cost-effective electricity market emerges to facilitate the integration of renewables. This paper analyzes the role of system planning and regulations on two specific elements in the energy market design: the concept of firm capacity and the presence of distributed energy resou… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…According to PSR (2023) this operation makes no economic sense, as it prioritizes more expensive thermoelectric generation and spills water from the reservoirs, restricting the possibility of cheaper, renewable hydroelectric generation. Furthermore, as determined by Werlang et al (2021) the expansion of NG-fired TPPs distributed throughout the territory, as determined by the law, would result in operating and investment costs 16% higher than in a scenario with TPPs concentrated in the Southern region of Brazil.…”
Section: Auctions For Ng-fired Tpps and The Advance Of Renewablesmentioning
confidence: 99%
“…According to PSR (2023) this operation makes no economic sense, as it prioritizes more expensive thermoelectric generation and spills water from the reservoirs, restricting the possibility of cheaper, renewable hydroelectric generation. Furthermore, as determined by Werlang et al (2021) the expansion of NG-fired TPPs distributed throughout the territory, as determined by the law, would result in operating and investment costs 16% higher than in a scenario with TPPs concentrated in the Southern region of Brazil.…”
Section: Auctions For Ng-fired Tpps and The Advance Of Renewablesmentioning
confidence: 99%
“…The determination of the required reserve is carried out through reliability studies [18][19][20] that result in reliability indices (e.g., energy not supply) associated with insufficient generation for different values of power reserve. Based on the results, the cost of the reserve and the cost of the quality of service are determined.…”
Section: System Reservesmentioning
confidence: 99%
“…Therefore, this electricity market is defined as a hydrothermal market, which is characterized by significant differences in the marginal costs of the generation sector, a heavy dependency on weather factors and fossil fuel prices, and a small renewable generation capacity (Fernández-Blanco et al, 2017;Mosquera-López et al, 2017). According to Werlang et al (2021) and Wang et al (2013), fuel prices are a driver of electricity prices because their shocks impact the opportunity costs of hydropower plants and increase the uncertainty of operation in the electricity system.…”
Section: Introductionmentioning
confidence: 99%