Reliability Improvement Strategies for HVDC Transmission System

Abstract: This paper analyses reliability data of HVDC systems of Southern China Power Grid. The weak links of HVDC systems' operational reliability are DC control and protection, valve hall and valve cooling system and transmission lines. Some improvement measures and HVDC system reliability technology are proposed in this paper.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
8
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(8 citation statements)
references
References 4 publications
0
8
0
Order By: Relevance
“…If the water channel is blocked, the element is 0; otherwise, it is 1. Formula (2.12) is as follows [24,25]:…”
Section: ) Structure Functionmentioning
confidence: 99%
“…If the water channel is blocked, the element is 0; otherwise, it is 1. Formula (2.12) is as follows [24,25]:…”
Section: ) Structure Functionmentioning
confidence: 99%
“…The faults in OHTL are involves the arcing phenomena triggered by the dust, humidity and the weather factor. The underground cable faults are less frequent, but its more permanent, that's occurring due to the electrical or environmental stresses and insulation damage [8][9][10][11][12]. The protection system should be providing fast for operation, localizing fault, reliability, selectivity and take appropriate action to isolate the fault zone.…”
Section: Stability In Hvac and Hvdc Systemsmentioning
confidence: 99%
“…Figure3 shows the power angle curve for the power system operation, where, atstable operations for the power system the system operates at δ 0 , the output of electric power produces by electric torque that equalized with the mechanical torque which applied to the rotor shaft for the generator [13].At any fault in the system, its will leads to increasing in the load current, so at this moment the mechanical power for the generator not equalized with the electrical power for the electrical loads, this case known an unstable condition in the system that's will increase the power angle to 90 degrees. At this point, the load current could only be met by increasing voltage source E s , E R .Left source has a phase angle advance equal to θ, and this angle will vary during the fault [9][10][11][12][13][14]. The power transferred from one source to another reach to maximum value P MAX when angle δ is 90 degrees, by increase the angle δ , this will cause a decrease of power transfer.…”
Section: Hvac Transient Stability Systemmentioning
confidence: 99%
See 1 more Smart Citation
“…Nowadays, the level of confiability of HVDC link must be greater than double AC line utilization [3] [4] [5].…”
Section: Introductionmentioning
confidence: 99%