Reliability design of preventive maintenance scheduling for cumulative fatigue damage

Abstract: As the cumulative running times of a locomotive truck increases, degradation such as fatigue, wear, and deterioration occur. Particularly the container train and uncovered freight train, their maintenance cost during their lifetime is three times more than the manufacturing cost. Generally, for the freight train, corrective maintenance to repair a bad part after a breakdown is not adapted; however, preventive maintenance that fixes a bad part before a breakdown is. Therefore, it is important and necessary to e… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
6
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 19 publications
0
6
0
Order By: Relevance
“…1,2 At present, maintenance strategy mainly can be divided into two types 3 : preventive maintenance strategy and corrective maintenance strategy. Corrective maintenance is to repair the equipment after failure [4][5][6] ; preventive maintenance generally refers to taking corresponding maintenance actions to delay the occurrence of the failure before the equipment fails. [6][7][8] Preventive maintenance can be further divided into two categories according to the basis of formulating maintenance strategies, namely condition-based preventive maintenance and time-based preventive maintenance.…”
Section: Introductionmentioning
confidence: 99%
“…1,2 At present, maintenance strategy mainly can be divided into two types 3 : preventive maintenance strategy and corrective maintenance strategy. Corrective maintenance is to repair the equipment after failure [4][5][6] ; preventive maintenance generally refers to taking corresponding maintenance actions to delay the occurrence of the failure before the equipment fails. [6][7][8] Preventive maintenance can be further divided into two categories according to the basis of formulating maintenance strategies, namely condition-based preventive maintenance and time-based preventive maintenance.…”
Section: Introductionmentioning
confidence: 99%
“…Maintenance is usually scheduled to prevent failure of a structure, and the maintenance interval is determined based on reliability (Torres-Echeverria and Thompson, 1 and Baek et al 2 ) or cost (Abjallah and Adzakpa 3 ). There is ongoing research on alternative condition-based maintenance (CBM) that continuously tracks a deteriorating system and requests maintenance when the deterioration level crosses a pre-determined threshold.…”
Section: Introductionmentioning
confidence: 99%
“…M AINTENANCE is usually scheduled to prevent failure of a structure, and the maintenance interval is determined based on reliability (Torres-Echeverria and Thompson [1], Baek, et al [2], etc.) or cost (Oke and Charles-Abjallah and Adzakpa [3]).…”
Section: Introductionmentioning
confidence: 99%