Safety and Reliability – Theory and Applications 2017
DOI: 10.1201/9781315210469-340
|View full text |Cite
|
Sign up to set email alerts
|

Reliability-based inspection planning in view of both crack initiation and propagation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 11 publications
0
5
0
Order By: Relevance
“…S-N method has been widely adopted in designing structures against fatigue, including both deterministic design methods [7] and probabilistic design methods [8]. The fracture mechanics (FM) method has been used to develop probabilistic models to assess fatigue reliability [9][10][11], to update inspection plans [12][13][14][15][16][17], and to develop cost-effective inspection & maintenance plans for existing structures [1,[18][19][20][21]. The studies address almost exclusively either fatigue design issues with little quantitative analysis in operational maintenance or address maintenance issues based on given design plans or existing structures.…”
Section: Figure 1: Lifetime Safety Decisions and Measures Against Fatiguementioning
confidence: 99%
See 1 more Smart Citation
“…S-N method has been widely adopted in designing structures against fatigue, including both deterministic design methods [7] and probabilistic design methods [8]. The fracture mechanics (FM) method has been used to develop probabilistic models to assess fatigue reliability [9][10][11], to update inspection plans [12][13][14][15][16][17], and to develop cost-effective inspection & maintenance plans for existing structures [1,[18][19][20][21]. The studies address almost exclusively either fatigue design issues with little quantitative analysis in operational maintenance or address maintenance issues based on given design plans or existing structures.…”
Section: Figure 1: Lifetime Safety Decisions and Measures Against Fatiguementioning
confidence: 99%
“…Moreover, an inspection result of no detection provides additional information which can be utilized to update failure probability and lifetime fatigue reliability . Normally, there are different amount of changes in and , as a result of the additional information collected at different time 1 , 2 , ⋯ , [16].…”
Section: Decision Variables In Maintenance Planningmentioning
confidence: 99%
“…The development of technical diagnostic tools made it possible to monitor the most dangerous damage of the fatigue type. This led to the emergence of algorithms Reliability Based Optimization (RBO) [7][8][9]. In them, the reliability function is estimated based on the probability of defect detection.…”
Section: Amalgamating Of the Reliability Indicators: What Is Meant Wmentioning
confidence: 99%
“…in offshore engineering, nuclear engineering and bridge engineering, etc. [8][9][10][11] . By integration of probabilistic modelling with life cycle cost modelling, cost based probabilistic optimization approaches have also been developed in support of rational and optimal maintenance decision-making under uncertainty 5,12,13 .…”
Section: Introductionmentioning
confidence: 99%
“…Probabilistic modelling and reliability methods have been applied to tackle with uncertainties consistently in maintenance modelling and optimisation of structural assets, for example, in offshore engineering, nuclear engineering and bridge engineering, etc. [8][9][10][11] By integration of probabilistic modelling with life cycle cost modelling, cost based probabilistic optimisation approaches have also been developed in support of rational and optimal maintenance decision-making under uncertainty. 5,12,13 A limitation of these probabilistic optimisation approaches is that a decision rule need to be set up in advance and then optimisation is performed on the maintenance strategy defined by the decision rule.…”
Section: Introductionmentioning
confidence: 99%