2017
DOI: 10.1016/j.ijrmms.2017.07.004
|View full text |Cite
|
Sign up to set email alerts
|

Reliability aspects of rock tunnel design with the observational method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
15
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
2

Relationship

4
5

Authors

Journals

citations
Cited by 33 publications
(17 citation statements)
references
References 33 publications
0
15
0
Order By: Relevance
“…The design method known as the observational method (Peck 1969) is based on this principle. Its application to design of underground openings has been discussed by for example Brantmark et al (1998), Stille andHolmberg (2008, 2010), Serra and Miranda (2013), Bozorgzadeh and Harrison (2016), Spross and Johansson (2017), and Bjureland et al (2017).…”
Section: Observational Approaches Are Fundamental To Underground Excamentioning
confidence: 99%
See 1 more Smart Citation
“…The design method known as the observational method (Peck 1969) is based on this principle. Its application to design of underground openings has been discussed by for example Brantmark et al (1998), Stille andHolmberg (2008, 2010), Serra and Miranda (2013), Bozorgzadeh and Harrison (2016), Spross and Johansson (2017), and Bjureland et al (2017).…”
Section: Observational Approaches Are Fundamental To Underground Excamentioning
confidence: 99%
“…How the principles of the observational method in the current version of the Eurocode 7 can be satisfied has been discussed by Prästings et al (2014), Spross et al (2016), Spross and Johansson (2017), Bjureland et al (2017), and Fuentes et al (2017).…”
Section: Observational Approaches Are Fundamental To Underground Excamentioning
confidence: 99%
“…This is due to two reasons: (1) in each project, the amount and distribution of monitoring points is limited, usually confined to buildings at risk (Figure 1a), mainly for cost-suppression and practical reasons (for example benchmarks on the ground above or near the tunnel axis are frequently destroyed during the project) and (2) monitoring data are rarely available because of their legal and financial implications in case of failure (cf. [15]).…”
Section: Introductionmentioning
confidence: 99%
“…The implementation of the observation methods (Bjureland et al 2017), comes to fore especially in rock related projects. The monitoring is included in Eurocode 7 as important aspect of design during construction -'monitoring shall be assessed at appropriate stages and the planned contingency actions shall be put into operation if the limits of behavior are exceeded'.…”
Section: Introductionmentioning
confidence: 99%