Reliability and availability analysis of a hybrid cooling system with water-side economizer in data center

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0
1

Year Published

2019
2019
2023
2023

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 40 publications
(14 citation statements)
references
References 11 publications
0
13
0
1
Order By: Relevance
“…A reliability block diagram (RBD) is a diagramming method for showing how components of reliability contribute to the success or failure of a complex system. An RBD can be converted into a success tree by replacing the series path with AND gates and parallel paths with OR gates [17]- [23].…”
Section: Reliability Block Diagrammentioning
confidence: 99%
“…A reliability block diagram (RBD) is a diagramming method for showing how components of reliability contribute to the success or failure of a complex system. An RBD can be converted into a success tree by replacing the series path with AND gates and parallel paths with OR gates [17]- [23].…”
Section: Reliability Block Diagrammentioning
confidence: 99%
“…On the other hand, in the design of a DCP-IES, the reliability of the energy supply is very important [32], as any equipment failure may cause instability or even failure of the entire energy system. To improve the reliability of the DCP-IES, standby devices are typically provided [33]. However, this involves increasing the initial investment.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Analisis RAM dapat dilakukan dengan menentukan komponen kritis yang memiliki availabilitas terendah dalam sistem Klasifikasi ABC dan pemodelan simulasi dapat dilakukan dalam analisis kuantitatif. Setelah menentukan komponen kritis, dilakukan analisis skenario dengan menerapkan strategi maintenance persediaan spare part pada komponen kritis tersebut (Wang, Zhang, Yoon, & Yu, 2019 , dilakukan analisis availabilitas dengan mempertimbangkan persediaan spare part. Dari penelitian ini telah diuji bahwa peningkatan persediaan spare part dapat meningkatkan availabilitas secara signifikan.…”