2019
DOI: 10.1016/j.ijmst.2018.04.016
|View full text |Cite
|
Sign up to set email alerts
|

Reliability analysis of production schedule in multi-element deposits under grade-tonnage uncertainty with multi-destinations for the run of mine material

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 21 publications
0
7
0
Order By: Relevance
“…In the meantime, economic resilience can be controlled by making the system to be able to maintain its function (such as the continuation of production) when a shock occurs. From this index perspective, cost prices 58,[89][90][91][92] and job creation 58,[92][93][94][95] parameters are very important. Each of these parameters is affected by the factors given in Figure 12.…”
Section: Sense Of Ownershipmentioning
confidence: 99%
See 1 more Smart Citation
“…In the meantime, economic resilience can be controlled by making the system to be able to maintain its function (such as the continuation of production) when a shock occurs. From this index perspective, cost prices 58,[89][90][91][92] and job creation 58,[92][93][94][95] parameters are very important. Each of these parameters is affected by the factors given in Figure 12.…”
Section: Sense Of Ownershipmentioning
confidence: 99%
“…Based on the above cases, to reduce the cost price, it is necessary to identify the factors affecting this parameter. Therefore, factors such as capital costs (A 1 ), operational costs (A 2 ), net present value (A 3 ), and rate of return (A 4 ) have been considered 58,[89][90][91][92] After establishing the hierarchical structure of the shearer system economic, a questionnaire containing 10 questions was designed to determine the status of the main influential factors in the case study. This questionnaire was answered by 15 economic crews and specialized shearer system.…”
Section: Sense Of Ownershipmentioning
confidence: 99%
“…Ajak et al(2018) , with uncertain geological data (such as ore grade and tonnage), used data mining for prediction to provide a flexible production plan for open-pit mining. Jamshidi and Osanloo(2019) investigated the production schedule in an iron ore mine aimed to maximize NPV. They also provided an integer hybrid programming model, in which the data on the tonnage and grade of iron ore was considered uncertain.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The BEV is generally used as a block attribute because most algorithms developed for the optimisation of the mining process use this attribute [9]. Equation ( 2) is a typical formula for calculating the BEV [10].…”
Section: Construction Of the Economic Block Modelmentioning
confidence: 99%