2014
DOI: 10.1016/j.proeng.2014.12.330
|View full text |Cite
|
Sign up to set email alerts
|

Reliability Analysis of CHU System of Coal Fired Thermal Power Plant Using Fuzzy λ-τ Approach

Abstract: The aim of this research work is to study the behaviour of the CHU (compressor house unit) of a medium size coal fired thermal power plant using fuzzy -approach (quantitative approach). The system has been modelled using PN and various reliability indices viz. failure rate, repair time, MTBF, ENOF, Availability and reliability are computed at different spread/uncertainty level. The results are helpful to the system analyst to analyse the behaviour of the system and to plan suitable maintenance policy for impro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2015
2015
2024
2024

Publication Types

Select...
4
3

Relationship

2
5

Authors

Journals

citations
Cited by 18 publications
(11 citation statements)
references
References 16 publications
0
11
0
Order By: Relevance
“…To reduce the accumulating phenomenon of fuzziness, accelerating the computation process and using different membership functions in such a way that computed reliability parameters have symmetric shapes, this study applies TBGFLT technique to analyze the fuzzy reliability of CHU system in a coal fired thermal power plant (Panchal and Kumar, 2014; Komal, 2018a). The procedural steps of the TBGFLT technique are as followings: Step 1.…”
Section: Procedural Steps Of the Presented Tbgflt Techniquementioning
confidence: 99%
See 3 more Smart Citations
“…To reduce the accumulating phenomenon of fuzziness, accelerating the computation process and using different membership functions in such a way that computed reliability parameters have symmetric shapes, this study applies TBGFLT technique to analyze the fuzzy reliability of CHU system in a coal fired thermal power plant (Panchal and Kumar, 2014; Komal, 2018a). The procedural steps of the TBGFLT technique are as followings: Step 1.…”
Section: Procedural Steps Of the Presented Tbgflt Techniquementioning
confidence: 99%
“…A coal fired thermal power plant consist of various functionary sub-system such as coal handling plant, coal crushing unit, water treatment plant, steam generating unit, power generating unit, CHU, ash handling unit, etc. (Panchal and Kumar, 2014). The present analysis is based on the study of CHU.…”
Section: A Case Studymentioning
confidence: 99%
See 2 more Smart Citations
“…Garg and Sharma (2012) purposed a new fuzzy lambda tau approach for analyzing the behaviour of Synthesis unit of a urea plant. Panchal and Kumar (2014) expounded the application of FM based lambda tau methodology for the reliability analysis of Compressor house unit of a coal fired thermal power plant located in northern India. Guimara˜es and Lapa (2007) developed a fuzzy decision support system for criticality rating of risky components of a nuclear power plant.…”
Section: Literature Reviewmentioning
confidence: 99%