2018
DOI: 10.1049/iet-smt.2018.5039
|View full text |Cite
|
Sign up to set email alerts
|

Relationship between PD magnitude distribution and pulse burst for positive coronas

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 21 publications
0
4
0
Order By: Relevance
“…The steps for evaluating the reliability of IES are described as follows: Step 1 : Input the load data, original data of IES, including equivalent parameters of gas turbines, parameters of conventional power plant and wind farm, and so on. Let j = 1. Step 2 : Randomly generate a uniformly distributed random number in (0, 1), simulate the wind speed v ( j ) [24], the operating states of wind turbines s wg ( j ) [25], gas turbines s gt ( j ) and conventional generators s tp ( j ). Then calculate the output power of wind farm P wt ( j ), gas turbines P gt ( j ), and conventional power plant P tp ( j ). Step 3 : Calculate the total generation power, and check the load curtailment state of IES.…”
Section: Reliability Assessment Of Ies Considering Uncertainty Of Ngpesmentioning
confidence: 99%
See 1 more Smart Citation
“…The steps for evaluating the reliability of IES are described as follows: Step 1 : Input the load data, original data of IES, including equivalent parameters of gas turbines, parameters of conventional power plant and wind farm, and so on. Let j = 1. Step 2 : Randomly generate a uniformly distributed random number in (0, 1), simulate the wind speed v ( j ) [24], the operating states of wind turbines s wg ( j ) [25], gas turbines s gt ( j ) and conventional generators s tp ( j ). Then calculate the output power of wind farm P wt ( j ), gas turbines P gt ( j ), and conventional power plant P tp ( j ). Step 3 : Calculate the total generation power, and check the load curtailment state of IES.…”
Section: Reliability Assessment Of Ies Considering Uncertainty Of Ngpesmentioning
confidence: 99%
“…Step 2 : Randomly generate a uniformly distributed random number in (0, 1), simulate the wind speed v ( j ) [24], the operating states of wind turbines s wg ( j ) [25], gas turbines s gt ( j ) and conventional generators s tp ( j ). Then calculate the output power of wind farm P wt ( j ), gas turbines P gt ( j ), and conventional power plant P tp ( j ).…”
Section: Reliability Assessment Of Ies Considering Uncertainty Of Ngpesmentioning
confidence: 99%
“…It will cause partial discharge (PD) as soon as the field strength exceeds a certain threshold, which is also the most common fault in high-voltage equipment [2]. In order to reduce the harmful effects of PD to the power system, recently, related scholars have researched from new insulation materials [3,4], online monitoring methods [5][6][7][8] and machine learning identification [9,10] etc. However, it is difficult for inspection workers to find PD in a short period, especially in noisy operating sites of switchgear.…”
Section: Introductionmentioning
confidence: 99%
“…It is concluded that due to the dependence of electrical and optical discharge of SBUV, the optical energy measurement should not only count the pulses but should also consider the pulses heights. In addition, the optical measurement should consider a statistical variation similar to that of electrical discharge measurements, as well [15].…”
Section: Introductionmentioning
confidence: 99%