2009
DOI: 10.1016/j.epsr.2008.11.002
|View full text |Cite
|
Sign up to set email alerts
|

Regional frequency response analysis under normal and emergency conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0

Year Published

2010
2010
2017
2017

Publication Types

Select...
3
3
2

Relationship

1
7

Authors

Journals

citations
Cited by 25 publications
(14 citation statements)
references
References 21 publications
0
13
0
Order By: Relevance
“…Traditionally, the total amount of load shed is set based on experience and then distributed to each shedding step with certain algorithms. There are several distribution methods roughly in three categories: equal step-size schemes, incremental step-size schemes and decremental step-size schemes [19].…”
Section: Attributes Of Existing Ufls Schemesmentioning
confidence: 99%
“…Traditionally, the total amount of load shed is set based on experience and then distributed to each shedding step with certain algorithms. There are several distribution methods roughly in three categories: equal step-size schemes, incremental step-size schemes and decremental step-size schemes [19].…”
Section: Attributes Of Existing Ufls Schemesmentioning
confidence: 99%
“…Small shifts in frequency do not degrade reliability or markets efficiency although large shifts can damage equipment, degrade load performance, and interfere with system protection schemes which may ultimately lead to system collapse." Bevrani et al [8] discuss control parameters and strategies in detail and stress that any degradation of electricity grid control system safety margins will result in frequent, unscheduled, widespread blackouts ("system collapse"). A recent German government report 2 highlights the likely catastrophic consequences resulting from any such event.…”
Section: Properties Of Electricity Gridsmentioning
confidence: 99%
“…Some of these occurrences are comprised of multiple falls and rises in quick succession. An output value that is 2% or less of total installed wind capacity 8 , termed here the Minimum Acceptable Level (MAL), is used in this analysis as the criterion of "near zero".…”
Section: Analysis Of Wind Farm Operational Datamentioning
confidence: 99%
“…ESS can also provide ancillary services for example frequency control. Frequency control [6] is the only service discussed in this paper, as BESS companies supply spinning reserve for the power system. The aim of frequency control is to maintain the balance between demand and generation as shown in Fig.…”
Section: Frequency Regulation In Ancillary Service Marketmentioning
confidence: 99%