2015
DOI: 10.1080/09537287.2015.1120362
|View full text |Cite
|
Sign up to set email alerts
|

REDUTEX: a hybrid push–pull production system approach for reliable delivery time in knitting SMEs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
3
3
1

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(6 citation statements)
references
References 20 publications
0
6
0
Order By: Relevance
“…A VSM application was proposed by Bin, Petersen, and Schneider (2016), where the combination of VSM and FLOW was evaluated to identify and alleviate information and communication related to challenges in large-scale software development. Baeza-Serrato (2016) proposed an approach called REDUTEX, which is based on theoretical concepts of lean and synchronous manufacturing to help to understand the behaviour of SMEs and to improve the manufacturing process by reducing customer lead times. Each of these studies used VSM to identify and eliminate activities that do not add value to the process integrating industry 4.0 tools.…”
Section: Literature Reviewmentioning
confidence: 99%
“…A VSM application was proposed by Bin, Petersen, and Schneider (2016), where the combination of VSM and FLOW was evaluated to identify and alleviate information and communication related to challenges in large-scale software development. Baeza-Serrato (2016) proposed an approach called REDUTEX, which is based on theoretical concepts of lean and synchronous manufacturing to help to understand the behaviour of SMEs and to improve the manufacturing process by reducing customer lead times. Each of these studies used VSM to identify and eliminate activities that do not add value to the process integrating industry 4.0 tools.…”
Section: Literature Reviewmentioning
confidence: 99%
“…(6) Create a time buffer: The time buffer is usually located before an assembly department and is a protection against fluctuations and delays in previous processes. In the example of Serrato (2016), it is located together with the supermarket. The time buffer purpose is to ensure that the components necessary to next day program are available.…”
Section: Double Speed Single Production Linementioning
confidence: 99%
“…A green point indicates a batch that meet specifications, yellow one within specifications limit and red a batch that does not meet specifications. Serrato (2016) suggests organizing the board in this way: columns (types of defects evaluated) and lines (batches evaluated). Even though it is a recent PCS, other references to REDUTEX include Hamja et al (2017) and Serrato (2018), however none of these articles contributes to further developed REDUTEX.…”
Section: Double Speed Single Production Linementioning
confidence: 99%
See 1 more Smart Citation
“…Engineering Village ((("lean") WN KY) AND ((("continuous flow" OR "one piece flow" OR "line balancing" OR "flow line" OR "cell manufacturing" OR "flow shop" OR "flow production" OR "manufacturing flow")) WN KY)) AND ((2016OR 2013OR 2010 WN YR) Scopus TITLE-ABS-KEY ( ( ( "lean" ) AND ( "continuous flow" OR "one piece flow" OR "line balancing" OR "flow line" OR "cell manufacturing" OR "flow shop" OR "flow production" OR "manufacturing flow" ) ) ) AND ( LIMIT-TO ( PUBYEAR , 2016 ) OR LIMIT-TO ( PUBYEAR , 2015 ) OR LIMIT-TO ( PUBYEAR , 2014 ) OR LIMIT-TO ( PUBYEAR , 2013 ) OR LIMIT-TO ( PUBYEAR , 2012 ) OR LIMIT-TO ( PUBYEAR , 2011 ) OR LIMIT-TO ( PUBYEAR , 2010 ) ) AND ( LIMIT-TO ( SUBJAREA , "ENGI" ) OR LIMIT-TO ( SUBJAREA , "BUSI" ) OR LIMIT-TO ( SUBJAREA , "ECON" ) ) AND ( LIMIT-TO ( DOCTYPE , "cp" ) OR LIMIT-TO ( DOCTYPE , "ar" ) )…”
Section: Base De Dados Strings De Buscamentioning
confidence: 99%