2013
DOI: 10.1016/j.ijpe.2013.06.009
|View full text |Cite
|
Sign up to set email alerts
|

Reducing worker(s) by converting assembly line into a pure cell system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
47
0
3

Year Published

2014
2014
2023
2023

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 66 publications
(50 citation statements)
references
References 12 publications
0
47
0
3
Order By: Relevance
“…Melakukan perencanaan tata letak akan mengidentifikasi dan mengalisis setiap aliran material dalam produksi (Zupan et al, 2017). Terdapat berbagai tipe aliran material yang memungkinkan pada saat produksi, mulai dengan aliran material yang panjang dan aliran material pendek yang keduanya dapat dilakukan untuk proses selama produksi (Karim & Biswas, 2015;Yu et al 2013). Terdapat beberapa faktor yang dapat menyebabkan berkurangnya produktivitas selama produksi, yaitu (Onkar et al 2015): 1.…”
Section: Abstrakunclassified
“…Melakukan perencanaan tata letak akan mengidentifikasi dan mengalisis setiap aliran material dalam produksi (Zupan et al, 2017). Terdapat berbagai tipe aliran material yang memungkinkan pada saat produksi, mulai dengan aliran material yang panjang dan aliran material pendek yang keduanya dapat dilakukan untuk proses selama produksi (Karim & Biswas, 2015;Yu et al 2013). Terdapat beberapa faktor yang dapat menyebabkan berkurangnya produktivitas selama produksi, yaitu (Onkar et al 2015): 1.…”
Section: Abstrakunclassified
“…McDonald et al (2009) focused on worker assigning into cells in order to minimize the net present cost while cross-trained workers are taken into consideration. Yu et al (2013) offered a solution to reduce number of workers without affecting on system performance. Their method emphasizes on determining the number of cells during cell forming step and assigning appropriate skilled workers to cells.…”
Section: Uncertain Market Demandsmentioning
confidence: 99%
“…They formulated a two-objective model to minimize the total training cost and to balance the total processing times among the cross-trained workers in each seru. Yu et al [12] presented a multiobjective lineseru conversion model, with the goals of reducing worker(s) and simultaneously increasing productivity, and performed several numerical simulation experiments to illustrate that the line-seru conversion can be used to reduce both worker(s) and the total throughput time. Ying and Tsai [13] discussed how to minimize total cost for training and assigning multiskilled workers in seru production systems.…”
Section: Literature Reviewmentioning
confidence: 99%