2019
DOI: 10.1080/00207543.2019.1680898
|View full text |Cite
|
Sign up to set email alerts
|

Reducing the total tardiness by Seru production: model, exact and cooperative coevolution solutions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
16
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 29 publications
(16 citation statements)
references
References 35 publications
0
16
0
Order By: Relevance
“…The following assumptions are made for the divisional seru manufacturing system: the type and batch of the product are known; the cost of new equipment and tools is ignored; in the assembly line, each worker performs only one process, so the number of workers (W) Is equal to the number of processes; The number of workers in different seru can be different; The assembly tasks in each divided seru are the same as the assembly tasks in the assembly line; The interval between adjacent batches of different types of products is heavy Set time, the interval between adjacent batches of the same product is 0. is the start processing time of the batch of products in the seru as shown in Equation (5).…”
Section: Assumptionmentioning
confidence: 99%
See 2 more Smart Citations
“…The following assumptions are made for the divisional seru manufacturing system: the type and batch of the product are known; the cost of new equipment and tools is ignored; in the assembly line, each worker performs only one process, so the number of workers (W) Is equal to the number of processes; The number of workers in different seru can be different; The assembly tasks in each divided seru are the same as the assembly tasks in the assembly line; The interval between adjacent batches of different types of products is heavy Set time, the interval between adjacent batches of the same product is 0. is the start processing time of the batch of products in the seru as shown in Equation (5).…”
Section: Assumptionmentioning
confidence: 99%
“…Kaku et al, built two goals in the model (total production time and total man-hours), and experiments based on numerical simulations were performed to analyze the effects of various operating factors on the line-battery conversion [3]. Reducing workers can address labor costs.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…For seru scheduling, there are few studies [13,18]. Yu et al selected ten usually used scheduling rules to investigate the performance of different rules on the line-seru conversion problem.…”
Section: Introductionmentioning
confidence: 99%
“…Sun et al (2019) [41] developed a cooperative coevolution algorithm which combining generic algorithm and local search, and the ant colony optimization algorithm for solving seru formulation and seru scheduling problem at the same time with the objective of minimizing makespan. Sun et al (2019) [42] used a cooperative coevolution algorithm to solve seru production problem aim at reducing the total tardiness. Although the researches above took worker assignment into account, few researches has considered the hierarchy of worker assignment decision and production allocation decision.…”
mentioning
confidence: 99%