Recycling of discharged soil from EPB shield tunnels as a sustainable raw material for synchronous grouting

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

1
11
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 39 publications
(12 citation statements)
references
References 19 publications
1
11
0
Order By: Relevance
“…e shield method is commonly applied in current subway construction. As an urban underground transportation project, shield subway tunnels should be durable and safe [1,2]. When the shield machine works, the surrounding soil is disturbed.…”
Section: Introductionmentioning
confidence: 99%
“…e shield method is commonly applied in current subway construction. As an urban underground transportation project, shield subway tunnels should be durable and safe [1,2]. When the shield machine works, the surrounding soil is disturbed.…”
Section: Introductionmentioning
confidence: 99%
“…Given that earth pressure balance shield-tunnel construction will require additives, such as surfactants, polymers, bentonite slurry, anti-wear agents, and defoamers, the effective removal of such additives in the excavated tunnel slag is the key point of its resource-use [ 13 ]. Moreover, treated TS can be used for concrete aggregate, embankment material, land backfill material, and synchronous grouting material [ 14 ].…”
Section: Introductionmentioning
confidence: 99%
“…Meanwhile, about 50,000 m 3 waste soil is produced during shield tunneling construction per km. A large amount of discharged soil and muck needs to be transported, accumulated, and absorbed, causing great environmental and economic problems [ 12 ]. Due to the different geology and complex composition of the discharged soil, systematic utilization is difficult.…”
Section: Introductionmentioning
confidence: 99%
“…Yang et al [ 23 ] used waste mud to prepare backfill grouting mortar. Zhang et al [ 12 ] prepared synchronous grouting material with discharged soil from the Zhengzhou metro line 3 project in China. The discharged soil could be used by mixing with clayey or sandy content in a proper mass ratio after treatment.…”
Section: Introductionmentioning
confidence: 99%