2016
DOI: 10.1007/978-3-319-47437-3_44
|View full text |Cite
|
Sign up to set email alerts
|

Recovery Behavior of Artificial Skin Materials After Object Contact

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
3
2
1

Relationship

2
4

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 25 publications
0
3
0
Order By: Relevance
“…This material was used as a phantom heart, breast or prostate tissue in earlier works [14][15]. The grasper was programmed to grasp the sample with a 1 sec ramp loading, 5 sec hold, and a 1 sec unloading [16], and with 1 minute interval to recover [17]. The grasping angle and the grasping force were characterized (Fig.…”
Section: A System Design Overviewmentioning
confidence: 99%
“…This material was used as a phantom heart, breast or prostate tissue in earlier works [14][15]. The grasper was programmed to grasp the sample with a 1 sec ramp loading, 5 sec hold, and a 1 sec unloading [16], and with 1 minute interval to recover [17]. The grasping angle and the grasping force were characterized (Fig.…”
Section: A System Design Overviewmentioning
confidence: 99%
“…Finite Element Analysis has been an effective tool for analyzing contact interactions between artificial fingers and various objects [6], [7], [8], [9], [10], [11], [12]. For this data set, the index finger of the low-cost 3D printed prosthetic hand was subjected to numerical failure analysis using LS-DYNA software (mmps R8.1.1, Livermore Software Technology Corporation (LSTC), USA) [13].…”
Section: Datamentioning
confidence: 99%
“…Procurement is a key factor in attaining client satisfaction and project success (Rwelamila, 2010). International Conference of Socio-economic Researchers ICSR (2016) in Cabibihan et al, (2016) affirmed that procurement as "an organizational system that assigns specific responsibilities and authorities to people and organizations, and specifies how different elements of a construction project would relate". There are various construction procurement methods which hail from the need to develop strategies that will meet the clients need in different circumstances (Oyeranti et al, 2011).…”
Section: Introductionmentioning
confidence: 99%