Abstract. The Gemini MCAO system, GeMS, is currently undergoing integration and test at the Gemini South base facility. GeMS has been in the work since 2001, and is finally reaching a state in which all the subsystems, except for the 50W laser, have been received, integrated and, in the large part, tested. In this paper, after a brief description of the system, we describe selected methods and results that we have obtained during the on-going integration period.