All Days 1991
DOI: 10.2118/22821-ms
|View full text |Cite
|
Sign up to set email alerts
|

Recompletions Using Large-Diameter Coiled Tubing: Prudhoe Bay Case History and Discussion

Abstract: The paper describes the recompletion of an oil well in the Prudhoe Bay field using coiled tubing (CT) in the first use of two inch outside diameter (OD) CT. The CT and currently available auxiliary equipment were installed inside of the existing production tubing to improve flowing tubing hydraulics. The feasibility of relatively large CT for production tubing is demonstrated. In the example well, installation of coiled tubing enabled a "dead" well to be restored to production at a rate of several hundred barr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

1993
1993
1995
1995

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
references
References 0 publications
0
0
0
Order By: Relevance