2009 IEEE Power &Amp; Energy Society General Meeting 2009
DOI: 10.1109/pes.2009.5275954
|View full text |Cite
|
Sign up to set email alerts
|

Recent experience with a hybrid SCADA/PMU on-line state estimator

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0
2

Year Published

2010
2010
2021
2021

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 26 publications
(16 citation statements)
references
References 3 publications
0
14
0
2
Order By: Relevance
“…In the second, a two stage SE is used, where the results of the first stage from a conventional SE and the phasor measurements are used in the second stage to form a linear SE. Inclusion of phasor measurements within static SE has been reported by several utilities [16][17][18][19]. The penetration of PMU measurements compared to conventional measurements is, however, still too limited to have a noticeable impact on the SE solution [20].…”
Section: Introductionmentioning
confidence: 99%
“…In the second, a two stage SE is used, where the results of the first stage from a conventional SE and the phasor measurements are used in the second stage to form a linear SE. Inclusion of phasor measurements within static SE has been reported by several utilities [16][17][18][19]. The penetration of PMU measurements compared to conventional measurements is, however, still too limited to have a noticeable impact on the SE solution [20].…”
Section: Introductionmentioning
confidence: 99%
“…. , n in (4) and (5) is known, but all other parameters are unknown, namely M i , E i , d i , r ik , and x ik . An example of such a network consisting of n = 6 generators and m = 9 tie-lines is shown in Fig.…”
Section: Problem Formulationmentioning
confidence: 99%
“…For this reason researchers have proposed hybrid state estimation schemes [4], integrating both PMU and SCADA data. Some of these methods incorporate the PMU measurements into the iterative state estimation updates [5]- [7], while others use PMU data to refine the estimates obtained from SCADA data [8], [9]. The estimation procedure becomes, again, iterative and, therefore, a rapid convergence to an estimation error that is lower than what PMUs alone can provide, is crucial to render these hybrid systems useful.…”
Section: Introductionmentioning