2017 IEEE International Conference on Environment and Electrical Engineering and 2017 IEEE Industrial and Commercial Power Syst 2017
DOI: 10.1109/eeeic.2017.7977882
|View full text |Cite
|
Sign up to set email alerts
|

Realization of 5-bus system using soft computing technique for flexible alternating current transmission system (FACTS) devices

Abstract: Total transfer capability analysis of power system is currently a critical issue in both planning & operating of systems. These issues mainly occur due to increase in area and interchanges among utilities. To reduce the flows in heavily loaded lines, Flexible Alternating Current Transmission System (FACTS) devices is used, this results in increased transfer capability, improve stability of the network, low system losses, and fulfill contractual required by controlling the power flows in the network. To achieve… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…To investigate the feasibility and efficiency of the proposed model, the IEEE 5-bus network structure is utilized in this research shown in figure 3 [39] [40]. The parameters are changed and the GDN also is added to match the problem.…”
Section: Results and Discussion 41 Test Structure And Assumptions Of Case Studymentioning
confidence: 99%
“…To investigate the feasibility and efficiency of the proposed model, the IEEE 5-bus network structure is utilized in this research shown in figure 3 [39] [40]. The parameters are changed and the GDN also is added to match the problem.…”
Section: Results and Discussion 41 Test Structure And Assumptions Of Case Studymentioning
confidence: 99%